Carriage Hills Dam – Estes Park, Colorado
AWC was called upon to reconstruct the Carriage Hills Dam. This project included:
- New outlet works (concrete encased outfall pipe)
- Crestwall and grouted riprap (430 CY with bedding)
- Boulder (265 CY with bedding) emergency spillway
- All associated grading (1,540 CY of breach).