Hammer Reservoir – Thornton, Colorado
American West Construction installed 1900 feet of perforated groundwater drain pipe, six 48 inch drain manholes, and one 72 inch flow meter manhole with electrical, instrumentation and control system. The system included an electrical enclosure, radio system (to both the existing building and electrical enclosure), a 258W solar panel, a flow meter, a flow transmitter, and a data logger.
In addition, we executed a change order for the installation of a SCH80 PVC tee with flange in the flowmeter manhole due to inadequate sensor/water level clearance and SCADA readings.