by americanwestconstruction | Aug 15, 2019
Trujillo Meadows Dam Outlet Works This project included the installation of 385’ of CIPP UV lined culvert including a sand filter diaphragm and heavy dewatering efforts. Additional work on the project included: A slope encasement structure with a staff gauge. Welded...
by americanwestconstruction | Dec 6, 2018
Beers Sisters Reservoir Dam Repairs The Mile High Flood District (MHFD)(formerly Urban Drainage and Flood Control District) awarded American West Construction, LLC (AWC) a Construction Manager/General Contractor (CM/GC) contract for a dam rehabilitation project at...
by americanwestconstruction | Jan 26, 2017
Carriage Hills Dam – Estes Park, Colorado AWC was called upon to reconstruct the Carriage Hills Dam. This project included: New outlet works (concrete encased outfall pipe) Crestwall and grouted riprap (430 CY with bedding) Boulder (265 CY with bedding)...
by americanwestconstruction | Jan 25, 2017
Bergen Reservoir Construction Project Jefferson County, Colorado This project consisted of rehabilitation of existing earthen dam, and included: Excavation of approximately 50,000 CY Placement of approximately 60,000 CY of embankment Placement of approximately 12,500...