by americanwestconstruction | Feb 28, 2017
Erie Highlands – Erie, Colorado American West Construction provided the utility work for a housing subdivision in Erie Colorado that included: 6,597’ LF of Sanitary Sewer 2,203’ LF of RCP Storm Sewer 5,804’ LF of Water Main (103 services each) 11,253’ LF of Curb...
by americanwestconstruction | Feb 2, 2017
Cottonwood Highlands Sewer Outfall – Parker, Colorado The drainageway installation on this project required over 1,527 cubic yards of boulders and riprap for seven drop structures. In addition, 1,550 linear feet of boulder wall concrete trickle channel, and...
by americanwestconstruction | Feb 1, 2017
McIntosh Lake – Longmont, Colorado Starting with manhole #1, at approximately 25’ deep of excavation a new 90” diameter manhole was installed with a 48” diameter Hobas pipe. Existing 24” diameter VCP pipe was removed. At approximately 250’ of outlet works pipe,...
by americanwestconstruction | Jan 26, 2017
Kenwood Outfall Storm Sewer and Roadway Improvements, Phase 1 – Commerce City, Colorado In October 2016, Urban Drainage and Flood Control District (UDFCD) contracted with American West for the construction of the improvements associated with Kenwood Outfall in...
by americanwestconstruction | Jan 26, 2017
Forest Hill Road – Evergreen, Colorado Jefferson County Road & Bridge Division contracted with American West Construction through FEMA funding to complete the following items on SH-74 & Forest Hill Road in Evergreen, Colorado. Repair existing slope and...