by americanwestconstruction | Jan 23, 2025
North Dry Gulch This project provided a much needed upgrade to the stormwater infrastructure in the floodplain zone near W. Colfax Avenue and W. 14th Ave. in Lakewood, CO. It improved flood protection to handle a 100-year flood event, and improved roadway conditions...
by americanwestconstruction | Jan 22, 2025
Big Dry Creek Parallel Sewer Phase 1 This project involved the installation of approximately 4,530 linear feet of 21-inch C900 sewer pipe parallel to an existing sewer to improve the system’s capacity to manage high sewage flows. The scope of work included...
by americanwestconstruction | Feb 28, 2017
Erie Highlands – Erie, Colorado American West Construction provided the utility work for a housing subdivision in Erie Colorado that included: 6,597’ LF of Sanitary Sewer 2,203’ LF of RCP Storm Sewer 5,804’ LF of Water Main (103 services each) 11,253’ LF of Curb...
by americanwestconstruction | Feb 1, 2017
McIntosh Lake – Longmont, Colorado Starting with manhole #1, at approximately 25’ deep of excavation a new 90” diameter manhole was installed with a 48” diameter Hobas pipe. Existing 24” diameter VCP pipe was removed. At approximately 250’ of outlet works pipe,...
by americanwestconstruction | Jan 26, 2017
Kenwood Outfall Storm Sewer and Roadway Improvements, Phase 1 – Commerce City, Colorado In October 2016, Urban Drainage and Flood Control District (UDFCD) contracted with American West for the construction of the improvements associated with Kenwood Outfall in...