North Dry Gulch Improvements

North Dry Gulch Improvements

North Dry Gulch This project provided a much needed upgrade to the stormwater infrastructure in the floodplain zone near W. Colfax Avenue and W. 14th Ave. in Lakewood, CO. It improved flood protection to handle a 100-year flood event, and improved roadway conditions...
Big Dry Creek Parallel Sewer Phase 1

Big Dry Creek Parallel Sewer Phase 1

Big Dry Creek Parallel Sewer Phase 1 This project involved the installation of approximately 4,530 linear feet of 21-inch C900 sewer pipe parallel to an existing sewer to improve the system’s capacity to manage high sewage flows. The scope of work included...
Erie Highlands

Erie Highlands

Erie Highlands – Erie, Colorado American West Construction provided the utility work for a housing subdivision in Erie Colorado that included: 6,597’ LF of Sanitary Sewer 2,203’ LF of RCP Storm Sewer 5,804’ LF of Water Main (103 services each) 11,253’ LF of Curb...
McIntosh Lake

McIntosh Lake

McIntosh Lake – Longmont, Colorado Starting with manhole #1, at approximately 25’ deep of excavation a new 90” diameter manhole was installed with a 48” diameter Hobas pipe. Existing 24” diameter VCP pipe was removed. At approximately 250’ of outlet works pipe,...